Operation started in 2006.
Located at Bhakra (Himachal Pradesh), this facility is well connected to rest of country by air, rail & road network. Nearest airport is Chandigarh just 100 km. from factory.
This facility is WHO-GMP approved. The manufacturing facility comprises of 120,000 sq.ft. of built-up area on a 1.80 acres of land with the following product lines:
Patch 5, Goalthai Industrial Estate, Near Bhakra Nangal Dam, Bilaspur District, Himachal Pradesh- 174201.
This facility has an annual manufacturing capacity of 500 million tablets, 300 million capsules, 20 million bottles, 20 million tubes and 20 million sachets.
Aluminium and Lamy Tube. The external preparations area is well equipped to handle oil phase, aqueous phase formulations with mixing
Read MoreThe liquid manufacturing area has line for 3000 liters tanks for mixing and filling areas. The packaging line consists of
Read More